SJC FACILITIES ADMINISTRATION, SHOPS & FLEET MAINTENANCE BUILDINGS
Owner: San Jose Mineta International Airport & City of San Jose
Location: San Jose, CA
Team: Karen Mar, Robert Soo Hoo, Lilliann Dolley, Khristine Melendez & Bruno Martinez
Status: Completed 2024
Builder: C. Overaa & Co.
Size & Cost: 24,500 sf & $34 million
Photography: Russell Abraham
The project includes 24,500 sf of building space. The program area is divided between an 8,650 sf 5-bay Fleet Maintenance Building and a 15,850 sf, two-story Administration and Shops Building that houses administrative offices over shops (Metal, Wood, Paint, Electrical and Key) for the Airport’s Facilities Division personnel. The site also includes parking areas for employees and the fleet vehicles necessary for airport operations including electric buses; car wash and fueling.
The 24-hour facility is adjacent to our first project with San Jose Mineta International Airport ARFF Station and was completed within 400 days utilizing a design-build delivery model. Strategies to meet the challenging schedule included:
Structured Collaborative Partnering helped the team accelerate decision-making with a “Solution Driven” approach to problem solving.
Design Schedule combined the programming and schematic design phases before the contract was finalized and included a permit documentation schedule in 70 calendar days.
Early Design of Structural and Electrical Systems to support construction and procurement schedules